Built
Power
Production
Briefly about the project:
Photovoltaic modules – Trina Solar;
Inverters – HUAWEI;
Metal structures are made of Metinvest metal;
Electrical equipment – Siemens, EVS-Engineering, Odesakabel;
Contractors – EVS-Engineering, MBK SYNERGY;
The size of the station is 38 hectares;
Connection to the network – 35 kV.